Report Introduction
During the fall of 2020, a stream walk was undertaken on Marsh Brook to determine possible sources of sediment contributing to the large delta in Lake Carmi at the confluence of Marsh Brook. The stream walk was done over four days 8/31, 9/25, 10/2, and 10/6. The stream walk was led by River Scientist Staci Pomeroy. Joining Staci was Peter Benevento (for the first day), Tucker Wehner (all days) and Karen Bates (last 3 days). Tucker is the Watershed Coordinator for the Franklin Watershed Committee (FWC), Peter is a member of the FWC, and Karen Bates is the Tactical Basin Planner for this area.
The stream walk was conducted to make observations of the current condition of the stream, document bank erosion, and identify possible project areas for improvement to the stream condition and/or reduce sediment loading to the stream. A Phase 2 Stream Geomorphic Assessment was done in 2006 on reaches M4T2.3S8.02 and M4T2.3S8.04 by Brendan O’Shea of Carmi Consulting. The stream walk provided a way to review how the stream has changed over the last 14 years and to capture information on additional reaches.
The stream walk was conducted to make observations of the current condition of the stream, document bank erosion, and identify possible project areas for improvement to the stream condition and/or reduce sediment loading to the stream. A Phase 2 Stream Geomorphic Assessment was done in 2006 on reaches M4T2.3S8.02 and M4T2.3S8.04 by Brendan O’Shea of Carmi Consulting. The stream walk provided a way to review how the stream has changed over the last 14 years and to capture information on additional reaches.
Report Executive Summary
The stream walk was conducted over four reaches: from the confluence with Lake Carmi to the upper reaches of the brook (Figure 1 & 2). These reaches were further refined through segmentation to capture differences along the brook for stream type and conditions; a total of 9 segments were created (Table 1). One segment, M4T2.3S8.04-B, was not evaluated due to the difficulty of walking the segment in a deep narrow channel with very high vegetation. Suggestion is to evaluate this segment in late winter /early spring when dense herbaceous vegetation is limited. Of the 8 segments, 3 were in fair condition and the remaining 5 were in good condition. The three segments in fair condition were the one most downstream and the two most upper segments assessed. Based on a map and remote sensing review of the segment M4T2.3S8.04-B is likely in poor to fair condition.
|
For more information and to read the full report written by DEC River Scientist Staci Pomeroy, click the link below:

Marsh Brook Stream Walk Report 2020 | |
File Size: | 7303 kb |
File Type: |